Custom projects · assessment and pilot

Solar EPC software that keeps the approved project together

Carry survey requirements and approved quotations into equipment allocation, installation milestones and warranty support.

The survey team, salesperson, installer and after-sales desk need the same accepted project record. ALGONLP scopes software for the handoffs between them: reviewed survey inputs, quotation versions, equipment allocation, installation tasks and support history.

AI-generated illustration of a solar engineer and technician reviewing a rooftop installation in safety equipment.
Illustrative workflow.

Workflow comparison

Before and after: how the workflow could change

Illustrative comparisons for a scoped implementation. The proposed workflow depends on agreed processes, supported integrations and staff use.

AI-generated illustration of the solar engineer and colleague comparing separate paper job folders beside completed rooftop panels.
TodayIllustrative workflow view.
AI-generated illustration of the same solar team handing over a coordinated job folder beside organized parts cases.
Proposed workflowIllustrative workflow view.

Keeps the quote’s assumptions and approvals available for later review.

Today
A survey note and the latest supplier price are absent from the quotation the customer receives.
Proposed workflow
A proposed quotation record links reviewed survey inputs, equipment and price versions.
How it works
Technical staff approve design inputs and authorised sales staff approve the commercial version before it is issued.

Gives installers a traceable scope and a clear owner for unresolved substitutions.

Today
The installation crew receives equipment and instructions that do not match the accepted quote.
Proposed workflow
The project links the approved scope to serial allocation and installation tasks.
How it works
Record equipment changes as exceptions, obtain the required review and update the crew’s project record.

Gives support the relevant project context without reconstructing the installation.

Today
Support asks the customer again for equipment details and commissioning documents.
Proposed workflow
The warranty ticket opens against the project’s equipment and handover history.
How it works
Staff retrieve the correct serial, accepted documents and recorded warranty terms, then assign the service request.

Illustrative example

A practical end-to-end example

Illustrative example: a site survey reveals a constraint that changes the equipment list. Technical staff review it, sales issues an approved quotation revision and the customer accepts it. Procurement reserves the agreed equipment and records serials. The crew closes reviewed commissioning tasks, and a later warranty enquiry opens against the correct project record.

Who supplies the solar control layer: the EPC or a software vendor?

First define the layer. Project workflow software tracks enquiries, approvals, equipment and handover records. Plant or inverter control changes how equipment operates. The responsible supplier for that control depends on the equipment, integration rights, engineering design and service agreement. An EPC can own the installation relationship while a software vendor supplies a defined application; neither should assume authority over the other's controls.

Keep commercial changes visible to installation

If a survey changes the equipment list, the customer-approved quotation should remain identifiable. A substituted inverter or revised installation date needs an owner and a visible handoff, not a note buried in a separate chat.

  • Sales enquiries and site-survey findings are captured in different places, so requirements are repeated or missed.
  • Supplier prices and quotation revisions change without a clear record of the version the customer approved.
  • Equipment reservations, serial numbers and crew plans are difficult to trace to the correct project.
  • Support staff cannot quickly find commissioning documents, installation details or the relevant warranty terms.

Keep the approved project record moving

  1. Qualify the enquiry

    Record the site, intended use, project owner and required survey information. Request only documents needed for the next step.

  2. Complete the survey

    Capture approved site notes, photographs and constraints. Assign technical questions to the qualified reviewer.

  3. Prepare a versioned quote

    Link the reviewed design inputs, equipment list, vendor prices and commercial terms. Retain the customer-approved version.

  4. Allocate equipment and teams

    Reserve items against the project, record serials and schedule crews using confirmed availability.

  5. Track installation milestones

    Record delivery, installation checks, commissioning and open issues, with staff sign-off at agreed stages.

  6. Hand over to support

    Retain accepted handover documents, equipment references and warranty or maintenance tickets in the same project history.

A project scope that follows the handoffs

A scoped build can include lead and survey CRM, quotation/BOM versions, approval queues, serial allocation, installation milestones and after-sales tickets. Existing accounts and specialist solar-design tools can be assessed for supported connections.

A CRM records the workflow; specialist tools and qualified staff provide engineering design. Capacity, equipment suitability, commercial assumptions and policy-sensitive calculations need traceable review.

AI assistance with technical and commercial sign-off

AI may extract bill fields or vendor price-sheet lines into drafts, summarise surveys and prepare explanations from approved calculations. Staff verify every extracted value. Engineers approve design and commissioning; authorised sales staff approve price and commitments. Regulation and tariff assumptions must be dated and checked before customer proposals are issued.

Is this a useful fit for your business?

A good fit is an installer or EPC team coordinating several salespeople, surveys and crews, particularly where project handover or maintenance is difficult.

A small equipment dealer may need a standard CRM or stock package. Complex design requirements need an appropriate engineering tool alongside operational software.

Agree the boundary before a pilot

Use a redacted survey, accepted quote and handover pack to define the first release. Engineering calculations, tariff assumptions and physical plant controls stay with the responsible specialists unless a separate, authorised scope says otherwise.

  1. Map the records

    Review a redacted survey, quote, equipment list and handover pack, identifying the authoritative source for each field.

  2. Pilot real exceptions

    Test a quotation revision, substituted equipment, rescheduled crew and unresolved commissioning item.

  3. Extend into support

    Train the teams and connect warranty or maintenance workflows after the installation record is reliable.

Agree the first release

Scope, migration and ongoing operation

What the agreed scope can include

  • Enquiry, survey and quotation history
  • Equipment allocation and installation stages
  • Handover, warranty and maintenance tasks

What needs separate scoping

  • Engineering design, policy advice and guaranteed customer savings are outside the CRM’s administrative role.

Data migration

Review open project stages, accepted quote versions, equipment serials and existing warranty or handover records.

Training and ongoing support

Train survey, sales, procurement, installation and support staff on approvals and project exceptions. Agree support hours, issue ownership, backups, recovery checks and change-request terms before rollout.

Useful answers

Questions and answers

Is this a ready-made inverter control system?

No. This offer concerns custom project and business workflow software. Any equipment connection must be separately assessed and explicitly authorised.

Can the system keep a history of approved quotes?

Quotation versions and approval records can be included in the scope. The approved version must remain distinct from a draft or a later request for change.

Can existing design tools stay in use?

Yes, where supported exports or interfaces make that workable. The fit review identifies which tool owns each record before a connection is proposed.

Can this calculate system sizing and customer savings?

Only through an explicitly scoped, reviewed calculation or specialist-tool connection. Engineering inputs and current tariff or policy assumptions must remain visible and accountable.

Can we track serial numbers and warranty claims?

That can be included where your staff capture reliable serials and warranty terms. Claims should link to the relevant equipment and approved handover record.

What determines the project cost?

Project stages, quotation rules, stock/serial tracking, design-tool access, data migration and after-sales requirements shape the estimate. Tool licences, hosting and support are identified separately.

When could we go live?

We set a phased schedule after discovery and access checks, rather than promise a date before scope is known. A rollout date depends on verified project records, quotation controls and installation-team acceptance of the pilot handover. Start with the agreed pilot and expand after sign-off.

Discuss a focused first step

Bring one project handoff that needs fixing

Tell us how enquiries become surveys, quotations and installation jobs. A redacted project pack can help identify the smallest useful pilot.

Discuss your EPC handoff →

Related solutions

Start a conversation

Tell us what you want to build.

Send a short brief on WhatsApp or use the contact form. The team will discuss the project and agree the next step with you.

Request on WhatsApp, opens a new tabContact form

This requests a consultation. It does not confirm an appointment.

Voice demonstration

Request a demo call

Use your own number. Carrier charges may apply.